Your location:home > News > Industry News >

Grid-electricity workover rig

2015-04-01 11:54      Click:times

  The grid electricity workover rig can meet all kinds of workover operational requirements due to its safety, stability, and reliability as well as excellent technical performances. The wellsite is now completely free from exhausted gas/oil emissions, and well site noise has also been greatly reduced. We can make a new contribution to save energy in oilfields by using this kind of environmentally-friendly workover rig.

MODEL

WXJ700(XJ40)

WXJ900(XJ60)

WXJ1100(XJ80)

Nominal service depth (ft)(27/8″EUE tubing)

11000

13000

18000

Nominal workover depth (ft)(27/8″DP)

6500

11000

15000

Max. hook load (lbf)

160000

202320

260000

Rated hook load (lbf)

90000

150000

180000

Motor model

YJS355L-8

YJS450L-8

YJS450L-8

Motor power (hp)

250

300

410

Effective height of mast (ft)

56

96

 

102

Drilling line diameter (in)

7/8

1

1

Hook speed (ft/s)

0.66~4.6

0.66~5.7

0.66~4.6

Approaching/departure angle

18°/14°

26°/16°

26°/17°

Min. ground clearance (in)

12.24

13.4

12.24

Max. gradient ability (%)

26

30

26

Min. turning diameter (ft)

108.27

92

108.27

Rotary table model

ZP70

ZP90

ZP135

Traveling block model

YG70

YG90

YG135

Swivel model

SL70

SL110

SL135

Overall moving dimension (ft)

38×8×13

54.8×10×13.5

61×10×13.8

Main unit mass (lb)

55200

93000

111000


TAG: